Four things the product does, each with its own page instead of a shared scroll: an editor built from live blocks, embeds that stay the real thing instead of a picture of it, a share link with control over who can do what with it, and tracking that shows who opened it, which parts were on screen, and for how long.
Pick the one you are asking about — it holds nothing else.
Every block a document needs, kept live instead of pasted in.
See what it doesTen embeds, none of them a screenshot.
See what it doesA link with a password, an expiry, and a comment boundary.
See what it doesSee the read, not just the send.
See what it doesEvery capability lives in the same editor, ready to build and send.
Start free — no card