An incident postmortem is the written review of an outage or near miss: what happened, the impact, a timeline, the contributing factors, and the action items that make it less likely to happen again. A blameless postmortem does this without naming anyone as the cause. The template below has every section, followed by a filled-in example you can copy and adapt.
The document matters more than the meeting. A team that holds a good review and writes nothing down has the same incident again in eighteen months, run by people who were not in the room.
Incident postmortem template
Copy this into whatever your team writes in. Every section earns its place; delete one only if you are sure no reader will look for it.
# Postmortem: [short description of the incident]
Status: Draft | In review | Final
Incident date: [YYYY-MM-DD]
Authors: [names]
Incident commander: [name]
Severity: [SEV1 to SEV4]
## Summary
Two or three sentences a non-engineer can follow: what broke, for whom,
for how long, and how it was fixed.
## Impact
- Customers affected: [number or share]
- Duration: [start to end, UTC]
- What they experienced: [errors, slowness, data affected]
- Business impact: [failed orders, missed SLA, support tickets]
## Detection
How we found out (alert, customer, employee), and how long after the
start.
## Timeline (UTC)
| Time | Event |
| ----- | ----- |
| 14:00 | [first event] |
## Trigger
The specific change or event that started the incident.
## Contributing factors
The conditions that let the trigger turn into an incident, each with
the evidence for it.
## Resolution
What ended the impact, and what was done afterwards to clean up.
## What went well
## What went badly
## Where we got lucky
## Action items
| Action | Type | Priority | Owner | Ticket | Due |
| ------ | ---- | -------- | ----- | ------ | --- |
## Supporting information
Links to dashboards, logs, the incident channel, related postmortems.
A postmortem example, filled in
A shortened example for a fictional checkout outage. The real one would link to graphs and the chat log.
# Postmortem: Checkout payments failed for 42 minutes
Status: Final
Incident date: 2026-11-04
Severity: SEV1
## Summary
From 14:03 to 14:45 UTC, every card payment at checkout failed.
A config change pointed production at a mistyped payment provider
URL. We rolled the change back once we saw the failures came from
the provider client, not the provider.
## Impact
- Customers affected: all customers paying by card, in every region
- Duration: 42 minutes
- About 1,900 checkouts failed; 310 support tickets
- No payments were taken twice and no card data was exposed
## Detection
The checkout error rate alert fired at 14:06, three minutes after the
deploy. It went to a team channel only; the phone page followed at
14:21 under the 15 minute escalation rule.
## Timeline (UTC)
| Time | Event |
| ----- | ----- |
| 13:58 | Config change merged after two approvals |
| 14:03 | Deploy reaches all regions; payment errors begin |
| 14:06 | Error rate alert fires in the team channel |
| 14:21 | Phone page; on-call acknowledges |
| 14:30 | Provider status page checked: provider healthy |
| 14:38 | Provider client logs show DNS failures on a new hostname |
| 14:41 | Config change reverted |
| 14:45 | Payment success rate back to normal |
## Trigger
A config change with a one character typo in the provider URL.
## Contributing factors
1. Staging uses the provider's sandbox URL, so the typo could not fail
in staging.
2. Config changes deploy to every region at once; code changes go to
one region first.
3. The review diff showed one changed line in a 400 line file, with
nothing marking it as a production endpoint.
4. The alert went only to a channel that had been muted the week
before during a noisy incident.
## What went well
The revert took three minutes once the cause was known.
## Where we got lucky
The incident happened mid-afternoon in Europe, outside our busiest
hours in North America.
## Action items
| Action | Type | Priority | Owner | Due |
| ------ | ---- | -------- | ----- | --- |
| Validate provider URLs against an allow list at deploy | Prevent | P1 | Payments | 2026-11-18 |
| Roll config changes out one region first | Mitigate | P1 | Platform | 2026-11-25 |
| Page by phone from the first minute for SEV1 alerts | Detect | P1 | SRE | 2026-11-11 |
| Add the provider DNS check to the payments runbook | Respond | P2 | Payments | 2026-11-18 |
Notice what the example does not contain: a name next to the typo. The engineer who made the change is in the incident channel, and probably helped write the timeline. The postmortem describes the change, the review and the deploy pipeline, because those are what the action items can fix.
What blameless actually means
The idea is older than software. John Allspaw described it for web operations in his 2012 Etsy post "Blameless PostMortems and a Just Culture", drawing on safety research in aviation and healthcare, and Google's Site Reliability Engineering book gave it a chapter, "Postmortem Culture: Learning from Failure". The argument in both is practical: if a review can end in punishment, people give a careful, defensive account, and the details that would have fixed the system never surface.
Blameless does not mean nobody did anything. It means:
- People are described by what they did and what they could see, at the time, with the information they had. "The on-call engineer acknowledged at 14:21" is fine. "The on-call engineer was slow" is not.
- Hindsight is named as hindsight. Everything looks obvious once you know the ending. Ask what made the wrong action look reasonable.
- "Human error" is where the investigation starts. If one typo can take down checkout, the typo is not the interesting part.
- Accountability means owning the follow-up, not absorbing the blame.
The hardest part is the first draft, because blame leaks into sentences without anyone intending it. Pick a sentence that turns up in first drafts and the strength of fix you would propose. The block rewrites it about the system and grades the action item.
Rewrite a sentence from a first draft
Pick a sentence of the kind that lands in postmortem drafts, then how strong a fix to propose. The same fact, written about the system, follows with the action item.
What is wrong with it
It names a person and stops there, so the review becomes about Dana. Everyone else learns to keep quiet about their own near misses.
Write it as
A config change with a typo in the payment provider's URL passed review and went to every region at once. Staging points at the provider's sandbox, which has a different URL, so the typo could not fail there.
Ask in the review
What made this change look safe to everyone who saw it before it shipped?
Action item
Strongest fixValidate provider URLs against an allow list at deploy time, and roll config changes out to one region first. Owner: [owner], by [date].
Strongest. The system stops the mistake whoever is on shift. It usually costs the most engineering time, so say how long it takes and who has that time.
The grades follow a simple rule: a reminder relies on someone remembering, a process change relies on someone following it, and a guardrail relies on neither. A postmortem whose action items are all reminders and trainings has not found the contributing factors yet.
Root cause vs contributing factors
Many templates still have a "Root cause" heading. It invites the team to stop at the first satisfying answer, usually the trigger. Outages in real systems almost always need several conditions at once: the typo, plus a staging environment that could not catch it, plus a deploy that skipped the canary, plus an alert nobody heard. Remove any one and the incident shrinks or never happens.
The five whys technique, which came out of Toyota's production system, helps if you let it branch. Ask "why" of each contributing factor separately, rather than following one chain to one answer. When two branches end at the same weakness, that is your highest priority action.
How to write good action items
Most postmortems fail here. A good action item is:
- Specific enough to be closed. "Improve monitoring" can never be finished. "Page by phone for SEV1 alerts from the first minute" can.
- Owned by a person or a team, with a due date.
- Typed: prevent, detect, mitigate, or respond. A list with no "detect" items usually means the team got lucky with detection.
- Tracked where real work is tracked. Each item gets a ticket in the normal backlog, linked from the postmortem. A list that lives only in the document is forgotten by the next sprint.
- Sized honestly. If the guardrail takes a quarter, say so, and add a cheaper mitigation for the meantime.
Review open postmortem actions at a regular meeting. The percentage closed on time is a better measure of your incident process than the number of incidents.
The postmortem meeting
Send the draft at least a day before. In the meeting, walk the timeline first, because people correct it and the corrections change the contributing factors. Then discuss the factors and agree the actions. Keep it to people who were involved plus one or two who were not, who ask the questions insiders have stopped asking.
A facilitator who was not on the incident helps a lot. Their job is to stop the conversation when it drifts to who, and steer it back to how.
How soon to write it
While memories are fresh: most teams aim for a draft within a few working days and a final version within two weeks. Pull timestamps from alerting, deploy logs and the incident channel as you write the timeline, and record times in UTC so responders in different time zones agree on the order of events.
Sharing a postmortem with customers
The internal postmortem names systems, tools and people that customers do not need. For customers, write a shorter incident report, sometimes called a reason for outage: what happened in plain terms, the impact on them, when it was resolved, and what you are changing. Leave out internal names and anything that helps an attacker.
That report often goes to a specific client contact, and it is one document you will want to see opened. Sent from Quixli as a public link, each visit is recorded with time on screen, so you know whether the client's team opened it before the review call. That works for public links only: a document shared with someone by email opens in their editor and records no visit. Keep the internal postmortem where your team works; if that is Quixli too, reviewers with Can comment can leave comments on the timeline line they remember differently.
Postmortem templates and runbooks
The most useful output of many postmortems is an updated runbook: the diagnosis step that took twenty minutes becomes a line someone can follow at 3 a.m. If the fix changed your architecture, record the decision in an architecture decision record so the next team knows why it is there. For the runbook side, the runbooks and playbooks page has a severity picker and a worked example of a step written for an incident.