Quixli has a block for most pictures a business document needs: a process, a sketch, numbers, a formula, a plan with dates, a grid of options, a content calendar and a headline figure. All of them are inserted from the / menu or the Elements panel, and edited by clicking the block and using its menu. Readers of the shared link see them as you do, without the editing menus.
| To show | Use | Type |
|---|---|---|
| A process, a system, a sequence of steps | Mermaid Diagram | /flow |
| A rough sketch or whiteboard | Excalidraw Drawing | /draw |
| Numbers to compare | Chart | /chart |
| A formula | Math Formula | /math |
| A plan with dates | Timeline | /gantt |
| SWOT, priorities, pros and cons | Matrix Grid | /swot |
| Posts or events by date | Calendar | /calendar |
| One headline number | Counter Card | /kpi |
Mermaid diagrams
Flowcharts, sequence diagrams, state diagrams, class diagrams and more, written as short text and drawn for you. The dialog has two tabs:
- Templates: 73 starting diagrams you can search (Search diagrams...) and filter by category, such as Flow & Process or Business & Strategy. Click one to preview it, Edit to open it in the code editor, or Add to insert it as it is.
- Code Editor: the diagram's text, with a live preview that redraws as you type. Insert (or Update when editing) is off while the code is empty or has an error. A mistake shows Rendering Error in the preview, so you see it before it reaches the document.
Click the diagram and choose Edit diagram to change it. Its menu also aligns it left, centre or right, and a tall diagram gets Show full diagram. Open fullscreen preview on the block shows it large, with Zoom in, Zoom out, Reset zoom, Fit to screen and Close (Esc); you can drag to pan.
Pasting a fenced code block marked mermaid creates a diagram straight away.
Excalidraw drawings
A hand-drawn whiteboard that opens full screen, for sketches, rough architecture and anything that does not fit a box-and-arrow template. Draw, then click Insert. To change it later, double-click the drawing or choose Edit drawing in its menu, and click Save & Close when you are done.
Note
View fullscreen on the block shows the drawing large with the same zoom controls as a Mermaid diagram.
Charts
Create chart offers Bar, Line, Pie, Doughnut, Radar and Polar charts. Add a title if you want one (Title (optional)), then fill in the grid:
- each row is a Label on the axis, such as a month;
- each column is a series, renamed in its header, with Add series and Remove series;
- Add row and Remove row change the number of labels;
- Change colour on a series picks from twelve colours.
Pie, Doughnut and Polar charts take one series, so the grid shows Slice and Value. The preview on the right updates as you type, and Insert puts the chart in. Click the chart and choose Edit chart to change the data later. The legend sits above the chart and cannot be moved.
Math
Math Formula, in the / menu or under Insert in the toolbar, opens Insert Math Formula. Type LaTeX under LaTeX Expression, or pick from the Insert symbol palette (Greek letters, sums, integrals, roots, arrows and comparison signs), and watch the Preview. Press Enter or click Insert. The formula goes into the line you are writing.
You can also type a formula straight into the text:
$$x^2 + y^2 = r^2$$makes a formula inside the line;$$$x^2 + y^2 = r^2$$$on a line of its own makes a formula on its own line.
A single pair of dollar signs, as in $x$, stays as text, so a sentence with two prices in it is not turned into a formula. To change a formula, delete it and insert it again: clicking a formula does not open it for editing.
Timelines
A Gantt chart of groups and tasks. Use Group and Task in the block's menu to add them. A task has a title, a group, Start and End dates, a description, a Status (Not Started, In Progress, Completed, On Hold or Cancelled) and Progress from 0 to 100. Turn on Milestone for a single date, shown as a diamond. Dependencies link tasks: Finish → Start, Start → Start, Finish → Finish or Start → Finish.
On the block, switch the scale between Day, Week and Month, move with Previous, Next and Today, and drag a bar to move or stretch it. Timeline settings colours bars by group or by status and turns progress, dependencies and the today marker on or off. View fullscreen gives a big plan room to breathe.
Matrix grids
A grid of labelled cells. Change template picks SWOT Analysis (the default), Priority Matrix, Pros & Cons, Eisenhower Matrix, Comparison (1×3) or Blank Grid; choosing a template replaces what is in the grid. Add row, Remove row, Add column and Remove column change its size, and Grid name gives it a title.
Calendars
A content calendar by Month or Week. Event in the block's menu adds one, with a title, a Platform (Instagram, Facebook, Twitter / X, LinkedIn, TikTok, YouTube, Pinterest, Threads or Custom), a date or a date range, a Status (Draft, Scheduled, Published or Cancelled), a link and notes. Calendar settings colours events by platform or status, shows or hides weekends and starts the week on Sunday or Monday.
Counter cards
One number with a label, for the figure a report leads with: revenue, uptime, sign-ups. Edit counter sets the value, the label, a prefix such as a currency sign, a suffix such as %, a trend (up, down or neutral, with a percentage) and a short description. Cycle theme switches between five looks.
Questions
Which should I use for a process: Mermaid or Excalidraw?
Mermaid if the diagram will change: you edit a line of text and the layout redraws. Excalidraw if it is a one-off sketch where the hand-drawn look helps.
Can I import a chart from a spreadsheet?
No. Type the rows into the chart's grid. For a live sheet, embed it with Google Sheets: see Images, videos and embeds.
Is there a limit on rows, series or tasks?
Charts, timelines and grids have no fixed limit. Past a dozen rows a chart gets hard to take in, so split it.